Tiny Tools logo DRE Calculator
 
Data
 
Project / Activity

(E1)
Errors Found
Before Delivery / Within Activity

(E2)
Errors Found
After Delivery /
After Activity*
NOTE: After Activity* - refers to the defects traceable to errors found during the Software
Engineering activity but was only detected after the activity was finished.
 
Result
Goal: D.R.E. = 1.0 (100%)
Sorry, this web page requires Java 1.1.